Key facts
| Item | What the official page says |
|---|---|
| Total funding for the Challenge | $60 million, from Alberta's TIER Fund |
| Maximum per project | Up to $10 million |
| Minimum request | $250,000 |
| Private match | At least 1:1 against the Challenge's funding; eligible cash and in-kind contributions from applicants and partners count |
| Where the project runs | Piloted, demonstrated or deployed in Alberta; the applicant can be based elsewhere |
| Expression of Interest deadline | December 16, 2026, through the funder's Grant Manager portal |
| Review | Two stages: an Expression of Interest, then a Full Project Proposal for shortlisted applicants |
Who it is for, and who it is not for
The Challenge is open to a broad range of lead applicants: farmers, ranchers, processors, forestry organizations, landowners, technology developers, small and medium-sized enterprises, industrial facility owners and operators, utilities and industry associations, among others. You do not have to be based in Alberta, but the project has to be piloted, demonstrated or deployed in the province, and you have to show how the solution benefits Alberta and could be adopted there.
- A good fit: a company with a technology ready for a field pilot, a commercial demonstration or a first-of-kind commercial deployment, with an Alberta operator or producer ready to host it.
- A good fit: agtech, water treatment, reclamation, remediation and waste-to-value companies that can measure both an environmental result and what the end user cares about, such as yield, input costs or payback.
- Not a fit: early research with no field deployment, a standalone software product, or a routine install of technology that is already commercial.
What it pays for, and what it does not
The Challenge funds scale-up, prototyping, field pilots, demonstrations and first-of-kind commercial projects. Its own examples include precision agriculture and robotics, nutrient and manure management, livestock methane reduction, controlled-environment agriculture, irrigation optimization, modular water treatment, desalination, leak detection, wellsite reclamation, contaminated soil and groundwater treatment, tailings water treatment, reforestation, recycling and waste-to-value, and landfill methane recovery.
| Supported | Not supported on its own |
|---|---|
| Field tests and pilots of a technology in an operating environment | Laboratory research, engineering or feasibility studies, front-end engineering design, market studies or roadmaps |
| Commercial demonstrations of near or fully commercial systems | Software or digital tools without direct field deployment and end-user adoption |
| First-of-kind commercial deployments run over their commercial life | Facility or building envelope improvements, and routine integration of commercial technology |
| Research, studies or software inside a larger project that ends in an eligible deployment | Protocol, measurement method or policy work, and business-as-usual deployments such as fully commercial biogas or landfill gas systems |
The funder publishes eligible expense and cost instructions with the call. Build the budget from that document: a cost outside it has to come from your side of the match.
A worked example
Hypothetical example
An Alberta water technology company plans a commercial demonstration at a host processor's site and asks the Challenge for $1,500,000.
That request sits between the minimum of $250,000 and the per project maximum of $10,000,000.
With a one-for-one private match, the company and its partners bring at least $1,500,000 in cash or in kind.
The project's total budget is then at least $3,000,000.
The deadline and how the intake works
- Read the Call for Expressions of Interest guidelines, the FAQ and the Expression of Interest template on the Challenge's official page.
- Submit the Expression of Interest through the funder's Grant Manager portal by December 16, 2026, Alberta time.
- The funder shortlists applicants, who are invited to submit a Full Project Proposal.
- Subject matter experts assess the proposals, overseen by an independent fairness monitor, on the technology opportunity, project readiness, emissions reductions, other environmental and economic benefits and commercial potential.
- The funder's Board of Directors makes the final funding decisions.
The funder asks applicants to read the guidelines and FAQ before writing in with a question. Send any question about fit early rather than in the final days before the deadline.
What a strong application needs
The funder says strong projects connect a measurable environmental result, such as lower greenhouse gas emissions or better water, soil, land or waste outcomes, with what the end user cares about: yield, quality, affordability, input and labour efficiency, reliability and payback. An application that argues only one side of that is weaker than one that shows both with numbers you can measure in the field.
- A named Alberta host site and an operator or producer who has agreed to run the pilot or demonstration.
- A clear stage: field pilot, commercial demonstration or first-of-kind deployment by the end of the project, with the evidence that you are ready for it now.
- The private match in writing, cash and in kind, from the applicant and each partner.
- A measurement plan for emissions and the other environmental results, since recipients report outcomes and share data with the funder.
- A path to adoption beyond the first site: who buys it next, and what evidence they need to see.
Questions
Who can apply to the ERA Agriculture, Water, and Land Challenge?
Farmers, ranchers, processors, forestry organizations, technology developers, small and medium-sized enterprises, facility operators, utilities and many other lead applicants. The applicant can be based outside Alberta, but the project must be piloted, demonstrated or deployed in Alberta.
How much funding is available?
The Challenge has $60 million in total. Each project can receive up to $10 million, with a minimum request of $250,000.
Do I need matching funds?
Yes. Funding from the Challenge must be matched by private funding on at least a 1:1 basis. Eligible cash and in-kind contributions from the applicant and partners count toward the match.
When is the deadline?
Expressions of Interest are due December 16, 2026, Alberta time, through the funder's Grant Manager portal. Shortlisted applicants are then invited to submit a Full Project Proposal.
Does the Challenge fund feasibility studies or software?
Not on their own. Studies, research and software can be part of a larger project that ends in an eligible field deployment in Alberta.
